Project
Install Cold Conservation Insulation for GTA HUB BP Tortue Project
Owner & Location
Owner : British Petroleum
Location : PT. Saipem Indonesia Karimun Branch
Client Name
PT. Insultec International Indonesia
Scope of Work
Install Insulation for Cold, Personeel Protection, Solar protection & Cryogenic Support Installation
Quantity
Time Frame
June 2021 – June 2022
Description
Material By Client
- Insulation Material : Polyisocyanurate
- Vapour Barrier : Buseal Wrap, Alumunium Foil
- Jacketing Material : Stainless Steel 316 L Sheet Thick 1 mm
Installation Work
- Fabrication Material
- Installation Multi layer Polyisocyanurate
- Installion Cyrogenic Support
- Installation Pavor Stop
- Installation Insulation Cover